Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />SECTION 01010 <br /> <br />8. <br /> <br />The proposed construction utilizing a tow trench and bench <br />construction is shown on drawing 4 of 4. <br /> <br />9. <br /> <br />Install 12-inch CMP, <br />structures. <br /> <br />8-inch PVC, 8-inch DIP and concrete <br /> <br />D. Contractor will be responsible for all work designated <br />Drawings, Specifications, Bid Schedule and as required <br />complete and workable repair.. <br /> <br />in the <br />for a <br /> <br />E. Location of the work is southeast of Paonia, Colorado. <br />to the Drawings for a specfic location. <br /> <br />Refer <br /> <br />1.02 DRAWINGS AND SPECIFICATIONS <br /> <br />A. The Drawings and Specifications are intended to provide <br />the information necessary for all parties concerned with <br />the contract to know the nature and amount of equipment <br />and materials required to successfully complete the work. <br />All work shall be conducted in accordance with these <br />Drawings and Specifications. <br /> <br />B. Record Drawings: The Contractor shall keep one set of <br />drawings on the job at all times, on which the grades, <br />alignments, boundaries, depths, configuration of all <br />piping and any other pertinent data shall be accurately <br />recorded. During the progress of work the Contractor <br />shall inform the Engineer of his findings and recordings. <br />At the completion of the job, he shall turn this set of <br />drawings over to the Engineer and assist the Engineer in <br />preparing "As-Built" drawings. The Contractor shall <br />designate one (1) employee other than the job superinten- <br />dant for recording all data. This employee shall be on <br />the job at all times that excavations are being made, <br />backfill is being placed, pipes are being placed and/or <br />relocated and structures are being built. <br /> <br />1.04 CONTRACTOR USE OF PF:EMISES <br /> <br />A. The Owner shall provide land or rights-of-way for the work <br />specified in this Contract and make suitable provisions <br />for ingress and egress, and the Contractor shall not enter <br />on or occupy with men, tools, equipment, or material, any <br />ground outside the right-of-way without the written <br />consent of the owner of such ground. Other contractors <br />and employees or agents of the Owner may for all necessary <br />purposes, enter upon the work and premises used by the <br />Contractor. The Contractor shall conduct his work so as <br />not to impede unnecessarily any work being done by others <br />on or adjacent to the site. <br /> <br />B. Limit the use of premises for work and construction <br />operations of this contract. <br /> <br />19 <br />