My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00402
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:24 AM
Creation date
10/5/2006 11:53:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153517
Contractor Name
Lone Cabin Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />SECTION 01010 <br /> <br />1.05 <br /> <br />OWNER OCCUPANCY <br /> <br />A. Owner will occupy premises during entire period of <br />construction for the conduct of his normal operations <br /> <br />1.06 PROTECTION OF PREMISES <br /> <br />A. Except as otherwise noted on the Drawings, the Contractor <br />shall not remove trees or prush except as required for <br />construction, and shall protect, clean or replace all <br />ditches, canals, culverts, etc encountered or damaged <br />during construction. <br /> <br />1.07 PRODUCTS FURNISHED BY OWNER <br /> <br />A. The owner will not furnish any products, material, <br />equipment, labor, etc for the work herein. Contractor to <br />divert any water required ~ith his own forces and <br />equipment, for pre-wetting of the borrow area. Water will <br />be available in the reservoir basin. <br /> <br />1.08 MATERIALS AND EQUIPMENT FURNISHED BY CONTRACTOR <br /> <br />A. <br /> <br />Products furnished by Contractor: <br />for construction of the wo~k. <br /> <br />All materials required <br /> <br />1.09 AWARD OF BID ITEMS AND CHAN~ES IN BID QUANTITIES <br /> <br />A. <br /> <br />Specific Bid Items in any schedule may be deleted prior to <br />award of the Contract if necessary to bring the Contract <br />into range of funds available. Contractor will be <br />informed of deletions prior to award. After the Contract <br />is awarded, the Owner may increase or decrease any item(s) <br />fifteen (15) percent of the total Contract Price without <br />further negotiation with the Contractor. <br /> <br />B. <br /> <br />Quantities shown in Bid Items are estimates <br />the purpose of obtaining comparative bids. <br />and/or change due to field conditions. <br /> <br />only used for <br />Quantities may vary <br /> <br />1.10 STATE AND LOCAL SALES AND USE TAX <br /> <br />A. The Owner is not a tax exempt entity. Contractor shall <br />pay sales taxes on materialS for this contract. <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.