My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00400
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:43 AM
Creation date
10/5/2006 11:53:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153588
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />===================================================================================== <br /> <br />AL TERNATIVE <br /> <br />ESTIr~ATED COST <br />INCLUDING <br />25% CONTINGENCY <br /> <br />DESCR I PTI ON <br /> <br />===================================================================================== <br /> <br />3 Embankment Dam <br /> <br />- Remove riprap from emergency spillway <br />- Backfill emergency spillway to dam crest elevation <br />- Repair/reinforce riprap on upstream face of dam <br />- Raise crest of dam, if necessary, to provide one <br />foot of freeboard (1.0 foot maximum), regrade and <br />slope to drain <br />- Extend toe drain up abutments <br />- Reconstruct Chambers Lake inlet dike <br /> <br />Outlet Works <br /> <br />- Replace outlet works <br /> <br />Spi 11 ways <br /> <br />- Remove existing service and auxiliary spillways <br />- Construct service spillway ogee of conventional <br />concrete <br />- Construct concrete grade beam one foot above <br />service spillway elevation <br />- Construct riprap-lined dike around grade beam <br />- Riprap line exit channel downstream of the spillways <br /> <br />$ 1,035,000 <br /> <br />===================================================================================== <br /> <br />The City, .together .with MKE,_sel~c.te_d Alternative No_. 2, in parallel with part <br />_o~ ..the auxni.ary_spillway solution .of ~1ternative ~o~ 3. The rehabilitation <br />solution would include: remove riprap from emergency spillway and replace on <br />upstream face of dam and/or auxiliary spillway; backfill emergency spillway to <br />level with the crest of the dam; raise crest of dam if necesssary and regrade <br />to drain; reconstruct Chambers Lake inlet dike; rel ine outlet works conduit; <br />remove existing service and auxiliary spillways; construct RCC service <br />spillway or ogee servi ce spill way of conventi onal concrete; construct <br />auxiliary spillway as a riprap-protected overflow dike with a concrete grade <br />beam along the centerline. <br /> <br />E-9 <br /> <br />1151c <br />
The URL can be used to link to this page
Your browser does not support the video tag.