My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00400
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:43 AM
Creation date
10/5/2006 11:53:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153588
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />------------------------------------------------------------------------------------- <br />------------------------------------------------------------------------------------- <br /> <br />Al TERNATIVE <br /> <br />===================================================================================== <br /> <br />DESCRIPTION <br /> <br />ESTIMATED COST <br />I NClUD IJjG <br />25% CONTINGENCY <br /> <br />1 Embankment Dam <br /> <br />I 2 <br /> <br />- Regrade crest of dam and slope to drain <br />- Reconstruct Chambers lake inlet dike <br /> <br />Outl et Works <br /> <br />- Patch, grout and repair existing conduit <br /> <br />Spi 11 ways <br /> <br />- Patch and repair service spillway <br />- Remove riprap from auxiliary spillway, regrade dike, <br />and replace/reinforce riprap. <br />- Regrade crest of emergency spillway <br />- Reconstruct and extend riprap groin on left side of <br />channel <br /> <br />$ 185,000 <br /> <br />Embankment Dam <br /> <br />Remove riprap from emergency spillway <br />- Backfill emergency spillway to dam crest elevation <br />- Repair/reinforce riprap on upstream face of dam <br />- Raise crest of dam, if necessary, to provide one <br />foot of freeboard (0.5 feet maximum), regrade and <br />slope to drai n <br />- Reconstruct Chambers lake inlet dike <br /> <br />Outlet Works <br /> <br />- Reline conduit (steel pipe, PVC pipe or In-situ Form) <br /> <br />Spi 11 ways <br /> <br />- Remove existing service and auxiliary spillways <br />- Construct new roller compacted concrete (RCC) service <br />spi 11 way <br /> <br />$ 390,000 <br /> <br />- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> <br />115lc <br /> <br />E-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.