<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />7.6 IMPLEMENTATION SCHEDULE <br /> <br />The notice to proceed with finalizing this feasibility report was given to Woodward-Clyde on <br />July 10, 1996. This Feasibility Report and final design began immediately. A draft copy of the <br />Feasibility Report was submitted to the CWCB in late July. <br /> <br />Once Final Design was completed in Mid-July, work began on the Plans and Specifications. <br />The Plans and Specifications were submitted to Jim Norfleet, SEO, Division 4 for dam safety <br />review on August 9, 1996. Jim Norfleet is currently reviewing these plans. <br /> <br />A Pre-Bid meeting with four contractors was held on July 16, 1996, at Vouga Dam to <br />familiarize the contractors with the site, the plans, and specifications. Bids are due on August <br />30, 1996. The contractors are aware the contract will not be awarded until the CWCB Board <br />Meeting on September 9 and 10, 1996. <br /> <br />The VRA hopes that the feasibility report and loan application will be accepted at this meeting. <br />The construction contract will be awarded following loan approval. Woodward-Clyde has <br />estimated the construction of the rehabilitation can be completed in approximately six weeks. <br />The construction can be completed before the significant probability of cold weather, which <br />could halt construction at the V ouga Dam site. <br /> <br />242161R1.DOC 01-12.97(3,08PM)/RPT <br /> <br />7-5 <br />