My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00396
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00396
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/5/2006 11:53:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153741
Contractor Name
Vouga Reservoir Association
Contract Type
Loan
Water District
72
County
Saguache
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />7.6 IMPLEMENTATION SCHEDULE <br /> <br />The notice to proceed with finalizing this feasibility report was given to Woodward-Clyde on <br />July 10, 1996. This Feasibility Report and final design began immediately. A draft copy of the <br />Feasibility Report was submitted to the CWCB in late July. <br /> <br />Once Final Design was completed in Mid-July, work began on the Plans and Specifications. <br />The Plans and Specifications were submitted to Jim Norfleet, SEO, Division 4 for dam safety <br />review on August 9, 1996. Jim Norfleet is currently reviewing these plans. <br /> <br />A Pre-Bid meeting with four contractors was held on July 16, 1996, at Vouga Dam to <br />familiarize the contractors with the site, the plans, and specifications. Bids are due on August <br />30, 1996. The contractors are aware the contract will not be awarded until the CWCB Board <br />Meeting on September 9 and 10, 1996. <br /> <br />The VRA hopes that the feasibility report and loan application will be accepted at this meeting. <br />The construction contract will be awarded following loan approval. Woodward-Clyde has <br />estimated the construction of the rehabilitation can be completed in approximately six weeks. <br />The construction can be completed before the significant probability of cold weather, which <br />could halt construction at the V ouga Dam site. <br /> <br />242161R1.DOC 01-12.97(3,08PM)/RPT <br /> <br />7-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.