Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 7-1 <br /> <br />CONCEPTUAL COST ESTIMATE <br />ALTERNATIVE 1 <br /> <br /> Item Quantity Unit Cost ($) Cost ($) <br />1. Breach Dewatering 1 1.S. 30,000 <br />2. Embankment Fill 40,000 cy 6.00 240,000 <br />3. 36" Outlet Pipe 130 ft 510.00 66,300 <br />4. 72" Outlet Pipe 145 If 860.00 124,700 <br />5. Intake Structure 1 1.S. 65,000 <br />6. Principal Spillway Tower 158 cy 475.00 75,050 <br />7. Outlet Structure 61 cy 425.00 ~ <br /> Total Construction $626,975 <br /> 20% Contingencies 125395 <br /> Estimated Construction Cost $752 370 <br /> <br />24116JRIT.7.] 02-12-97(3:00PM}'RPT <br /> <br />Sheet 1 of 1 <br />