My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00396
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00396
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/5/2006 11:53:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153741
Contractor Name
Vouga Reservoir Association
Contract Type
Loan
Water District
72
County
Saguache
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 7-1 <br /> <br />CONCEPTUAL COST ESTIMATE <br />ALTERNATIVE 1 <br /> <br /> Item Quantity Unit Cost ($) Cost ($) <br />1. Breach Dewatering 1 1.S. 30,000 <br />2. Embankment Fill 40,000 cy 6.00 240,000 <br />3. 36" Outlet Pipe 130 ft 510.00 66,300 <br />4. 72" Outlet Pipe 145 If 860.00 124,700 <br />5. Intake Structure 1 1.S. 65,000 <br />6. Principal Spillway Tower 158 cy 475.00 75,050 <br />7. Outlet Structure 61 cy 425.00 ~ <br /> Total Construction $626,975 <br /> 20% Contingencies 125395 <br /> Estimated Construction Cost $752 370 <br /> <br />24116JRIT.7.] 02-12-97(3:00PM}'RPT <br /> <br />Sheet 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.