My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00376
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:23 AM
Creation date
10/5/2006 11:51:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153364
Contractor Name
Beck, R. W. and Associates
Water District
0
County
Garfield
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-.' <br /> <br />.,' <br /> <br />" <br /> <br />- <br /> <br />Provision for supplying water to the Bluestone <br />irrigation ditch from the reservoir will also be made. <br /> <br />Task 12 - Optimization of Selected Arrangement <br /> <br />The preliminary layout previously established for the <br />selected arrangement shall be refined and accomplished in more <br />detail to permit a more accurate cost estimate to be made. This <br />will include a more detailed analysis of sizing of project <br />features and a better layout of civil and structural features <br />and of mechanical and electrical equipment, including power <br />conduit, powerhouse, switchyard and other pertinent features as <br />required. The installed capacity for this arrangement will be <br />that selected in Task 15. <br /> <br />The preliminary design effort shall be accomplished in <br />sufficient detail to permit the preparation of a detailed cost <br />estimate of the proje~t. In carrying out this work task, the <br />Contractor shall: <br /> <br />a. Based on the results of the initial field investigations <br />related to site specific investigations, refine <br />preliminary design criteria of the project layout. <br /> <br />b. Compare different diversion schemes as they may affect <br />the selected project arrangement. <br /> <br />c. Optimize penstock diameter nased on diversion and power <br />requirements. <br /> <br />d. Complete field investigations and evaluations to develop <br />the preliminary design of the dams, spillways and <br />powerhouse. <br /> <br />e. Select type and layout of mechanical and electrical <br />equipment and other pertinent features, as required. <br /> <br />f. Develop preliminary design drawings of the project <br />features in s.ufficient detaIl, together with supporting <br />information, for inclusion in the study's final report. <br /> <br />Task 13 - Potential Uses of Water <br /> <br />Due to the likelihOOd of Una water costs being relatively <br />high, it i.s anti'cipated that, in the absence of subsidi.es, the <br />types of water users most likely to be seriously interested in <br />contracting for purchase of Una water would be industries and <br />municipalities. The industri.al water demand of concern is that <br />of the energy industry, including shale oil development, coal <br />gasification, thermal power plants, and coal mining. While the <br /> <br />-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.