My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00376
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:23 AM
Creation date
10/5/2006 11:51:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153364
Contractor Name
Beck, R. W. and Associates
Water District
0
County
Garfield
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(. <br /> <br />~ <br /> <br />Est imated Labor <br />Man-Weeks <br /> <br />Tasks <br /> <br />1. Study Administration and Control 13 <br /> <br />2. Meetings 6 <br /> <br />3. Compilation and Review of Existing Data 3 <br /> <br />4. Site Inspection 2 <br /> <br />5. Geotechnical Investigation 28 <br /> <br />6. Surveys 8 <br /> <br />7. Analysis of Flood Hydrology and Sedimentation 4 <br /> <br />8. Water Rights Evaluation and Storable Water Analysis 25 <br /> <br />9. Operation Studies for Water Yield and Power Generation 8 <br /> <br />10. Comparison of Alternative Arrangements - Dam and <br />Appurten~nces 18 <br /> <br />.11. Railroad and Other Facility Relocations 13 <br /> <br />12. Optimization of Selected Arrangements 3 <br /> <br />13. Potential Uses of Water 3 <br /> <br />14. Power Value Analysis 2 <br /> <br />15. Selection of Power Installation 3 <br /> <br />16. Cost EstImate 6 <br /> <br />17. Final Report <br /> <br />Tot al <br /> <br />7 <br />152 <br /> <br />The estimated work effort in man-weeks for each task may be <br />revised to change emphasis among tasks. These revisions are <br />subject to the procedure outlined in paragraph 9 of the contract. <br /> <br />Task 1 - Study AmInIstratIon and Control <br /> <br />The Contractor shall: <br /> <br />a. Prepare a detailed plan of study CPOS). <br /> <br />b. Coordinate and integrate the work among disciplines <br />and among consultants and subcontractors retained by it. <br /> <br />c. Monitor and control expenditures and progress of the <br />study. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.