Laserfiche WebLink
<br />(. <br /> <br />~ <br /> <br />Est imated Labor <br />Man-Weeks <br /> <br />Tasks <br /> <br />1. Study Administration and Control 13 <br /> <br />2. Meetings 6 <br /> <br />3. Compilation and Review of Existing Data 3 <br /> <br />4. Site Inspection 2 <br /> <br />5. Geotechnical Investigation 28 <br /> <br />6. Surveys 8 <br /> <br />7. Analysis of Flood Hydrology and Sedimentation 4 <br /> <br />8. Water Rights Evaluation and Storable Water Analysis 25 <br /> <br />9. Operation Studies for Water Yield and Power Generation 8 <br /> <br />10. Comparison of Alternative Arrangements - Dam and <br />Appurten~nces 18 <br /> <br />.11. Railroad and Other Facility Relocations 13 <br /> <br />12. Optimization of Selected Arrangements 3 <br /> <br />13. Potential Uses of Water 3 <br /> <br />14. Power Value Analysis 2 <br /> <br />15. Selection of Power Installation 3 <br /> <br />16. Cost EstImate 6 <br /> <br />17. Final Report <br /> <br />Tot al <br /> <br />7 <br />152 <br /> <br />The estimated work effort in man-weeks for each task may be <br />revised to change emphasis among tasks. These revisions are <br />subject to the procedure outlined in paragraph 9 of the contract. <br /> <br />Task 1 - Study AmInIstratIon and Control <br /> <br />The Contractor shall: <br /> <br />a. Prepare a detailed plan of study CPOS). <br /> <br />b. Coordinate and integrate the work among disciplines <br />and among consultants and subcontractors retained by it. <br /> <br />c. Monitor and control expenditures and progress of the <br />study. <br /> <br />-2- <br />