Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />22. Field reconnaissance of CRRP alternatives will be limited to seven business days in the <br />field by a team of seven Consultant team members. <br /> <br />Work Tasks <br /> <br />The following tasks will be performed to accomplish the study objectives to the extent that the <br />Study budget and schedule constraints permit. <br /> <br />Task 1 - Data Collection and Review <br /> <br />Conduct a focused data collection effort to obtain specific information that is currently available <br />and would be of specific use in the conduct of the study. Data collection will include studies <br />currently in progress to the extent that such information might be made available in a timely <br />basis. <br /> <br />la. Review studies, reports or otheT available data for use in the study. Sources of <br />information include but are not limited to: the Water Resources Information Center of the <br />CWCB, the library of the Colorado Water Resources & Power Development AuthoTity, <br />the library of Colorado State University, U.S. Bureau of Reclamation, Colorado River <br />Water Conservation District, City and County of Denver, Colorado Springs, and Northern <br />Colorado Water Conservancy District. <br /> <br />lb. Prepare a bibliography of the most pertinent data collected. <br /> <br />Task 2 - Comoilation of Water Demand Studies on the Arkansas. South Platte and <br />Colorado River Mainstem <br /> <br />Compile the most current readily-available water demand studies for the Arkansas, South Platte <br />and Colorado River Mainstem basins. This information may include growth projections, water <br />use analysis, tabulation of existing infrastructure, and drought preparedness. <br /> <br />2a. Review water demand studies recently completed or in progress conducted by major <br />water providers in the three major basins of the Arkansas, South Platte and Colorado <br />River Mainstem. <br /> <br />2b. Prepare a bibliography of the most pertinent data collected. <br /> <br />Task 3 - Final Scovin!! Activities <br /> <br />The Technical Committee, CWCB staff and the Consultant will participate in an alternatives <br />identification workshop and subsequently review the Scope of Work to make needed mutually <br />agreeable revisions approximately two months after receipt of the Notice to Proceed. Revisions <br />are not expected to result in changes in the overall level of effort or in the study budget. <br /> <br />Page 7 of ] 2 <br /> <br />Contract SCOPE 5-)-03 BND <br />