My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150141 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150141 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150141
Contractor Name
Boyle Engineering Corporation
Contract Type
Grant
Water District
0
Bill Number
SB03-110 Section 15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Task 4 - Overview of the Phvsical Environment <br /> <br />Prepare brief overviews of the physical environment in the river basins through which the CRRP <br />may be constructed for use as background information in later work tasks. <br /> <br />4a. Prepare overviews of the Colorado Main-Stem and Gunnison river basins' physical <br />environment in relation to the following: <br /> <br />I. Climate <br />2. Drought characteristics <br />3. Water quality <br />4. Recreational resources <br />5. Topography <br />6. Surface water resources" <br />7. Land use <br />8. Existing Infrastructure <br />9. Geology <br /> <br />10. Groundwater Resources <br /> <br />11. Vegetation <br /> <br />12. Energy/mineral resources <br /> <br />(" Includes general characterization of current and projected uses of available <br />water and physical and legal availability of water to the extent this information <br />can be obtain from existing reports and modeling efforts.) <br /> <br />4b. Prepare an overview of the existing infrastructure and necessary infrastructure in the <br />South Platte and Arkansas basins to deliver water from CRRP to those river basins. For <br />the purposes of this study, it is assumed that it will be the responsibility of project users <br />to deliver water from the project terminus to their respective delivery systems. <br />Suggestions on the location or locations of the project terminus will be made. <br /> <br />Task 5 Institutional Settinll <br /> <br />Describe the institutional setting for water use and development in Colorado such that the <br />information can be utilized in formulating and evaluating project configurations in Tasks 7 and 8 <br />and in determining project selection and development strategies in Tasks 9 and 10. The general <br />existing institutional settings related to the following issues will be summarized in memoranda <br />approximately five pages or less in length: <br /> <br />a) State, regional and federal agencies involved in Colorado water supply and water <br />quality issues, <br /> <br />b) Brief overview of applicable Colorado water law, <br /> <br />c) Federal statutes, policies and regulations affecting water supply, <br /> <br />Page 8 of 12 <br /> <br />Contract SCOPE 5-1-03 BND <br />
The URL can be used to link to this page
Your browser does not support the video tag.