Laserfiche WebLink
<br />.~. <br /> <br />.,4. <br /> <br />.1 <br /> <br />Briefly describe the construction requirements: The new gates will be <br />located at the toe of the upstream slope of the dam, which will replace the existing <br />gates now located in the gate shaft underneath U.S. Highway 34. <br /> <br />The eroded outlet tunnel will be relined by one of the following methods: <br /> <br />1. Apply gunite to the internal wall of the outlet tube. <br />2. Reline the outlet tube with high-density polyethylene ribbed pipe (spirolite) <br />and pressure-grout the annular space. <br /> <br />3. Reline the outlet tube with coal tar or epoxy lined steel pipe and pres- <br />sure grout the annular space. <br /> <br />Are the water rights now owned by the applicant sufficient for <br />the contemplated project'? Yes <br />If NO, briefly explain how the water rights could be obtained: <br /> <br />5. Approximately how many persons would benefit from the project? <br /> <br />30Ut irrigators and the City of Greeley, <br />