My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00371
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:43 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0021X
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.~. <br /> <br />.,4. <br /> <br />.1 <br /> <br />Briefly describe the construction requirements: The new gates will be <br />located at the toe of the upstream slope of the dam, which will replace the existing <br />gates now located in the gate shaft underneath U.S. Highway 34. <br /> <br />The eroded outlet tunnel will be relined by one of the following methods: <br /> <br />1. Apply gunite to the internal wall of the outlet tube. <br />2. Reline the outlet tube with high-density polyethylene ribbed pipe (spirolite) <br />and pressure-grout the annular space. <br /> <br />3. Reline the outlet tube with coal tar or epoxy lined steel pipe and pres- <br />sure grout the annular space. <br /> <br />Are the water rights now owned by the applicant sufficient for <br />the contemplated project'? Yes <br />If NO, briefly explain how the water rights could be obtained: <br /> <br />5. Approximately how many persons would benefit from the project? <br /> <br />30Ut irrigators and the City of Greeley, <br />
The URL can be used to link to this page
Your browser does not support the video tag.