My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00371
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:43 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0021X
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br />I <br /> <br />~' <br />APPLICATION FOR STATE WATER I JECT <br />~ r <br /> <br />, <br /> <br />ltAY, <br /> <br />'91986 <br /> <br />TO: <br /> <br />Colorado Water Conservation Board <br />823 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />1. Name of Applicant(s) (Sponsor(s): Greelev and Loveland Irrigation <br /> <br />CO'_' <br />Co;\~ ... <br /> <br />Company <br /> <br />Mailing Address: 808 23rd .Avenue <br /> <br />I <br /> <br />Greeley, Colarado 80631 <br /> <br />I <br />r- <br /> <br />Telephone Number: (303) 352-0495 <br /> <br />2. Briefly describe the purpose, location and need for the project: <br /> <br />The .State Engineers' Office and the applicant's engineer have deter- <br />mined that the south outlet tunnel located along Colorado Avenue, Loveland, <br />Colorado, and its outlet gates for Lake Loveland reservoir are in poor <br />condition. There has been progressive erosion of the outlet tunnel and <br />gate structure over the past 80 years. The south outlet tunnel facility <br />of Lake Loveland is to be repaired and improved to allow the lake to dis- <br />charge in emergencies, supplement the north outlet gates in supplying <br />irrigation water to its users, and for draining the lake for maintenance <br />and repair. In addition, presently there is no spillway for Lake Loveland <br />and the south outlet tunnel is one of two ways that water can be lowered <br />from the reservoir, The erosion of the outlet tunnel and gate structures <br />has. become significant and warrants rehabilitation. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.