My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00371
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:43 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0021X
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e: <br /> <br />I <br />I <br />I <br />lei <br />I <br />I <br /> <br />'e} <br /> <br />6. If for irrigation, approximate number of acres which would be <br /> <br />benefitted: 22,933 A <br />New land: --0- A <br /> <br />Presently irrigated: 22,933 A <br /> <br />7. Estimated project cost, if known: $493.:il25.. <br /> <br />8. <br /> <br />Has any other type of financing been explored? No. <br /> <br />If YES, through what agencies and with what results? <br /> <br />* Although the Colorado Department of Highway participation includes <br />$53,000 for improvements relative and affecting their right-of-way. <br /> <br />* <br /> <br />9. Have any written reconnaissance or feasibility reports been <br />prepared for this project? Yes <br />If YES, please submit a copy of such reports, if available.. <br /> <br />10. Have any consultants been employed to investigate this project? <br />Ye" <br />If YES, please give name and address of such consultants: <br /> <br />Nelson Engineers <br />822 Seventh Street, Suite 520 <br />Greeley National Bank Plaza <br />Greeley, Colorado 80631 <br /> <br />11. State the total cash expenditure already made or incurred, if any, <br />by the applicant in investigating the feasibility of the project; <br /> <br />$42,487,08, This amount includes the feasibility study, design studies, <br />and construction plans and specifications costs to date. <br />
The URL can be used to link to this page
Your browser does not support the video tag.