My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00370
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00370
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0031X
Contractor Name
Yampa Project DNR 1972
Contract Type
Miscellaneous
Water District
0
County
Moffat
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.' <br />I <br />I <br />I <br />I <br /> <br />SUMMARY <br />This proposal sets forth two alternatives for increasing the dam height and <br /> <br />reservoir size of the planned E1khead Creek Dam and Reservoir. The present <br /> <br />. plan, as defined by the former Colorado Division of Game, Fish and Parks, <br /> <br />is to build a 57 feet high dam which will create a reservoir with a maximum <br />surface area of 262 acres at elevation 6340 feet with a total capacity of <br /> <br />5,250 acre-feet, at an estimated project cost of $425,000. <br /> <br />The alternatives proposed herein will provide emergency water storage for a <br /> <br />steam electric generating plant which is to be built southwest of the City <br /> <br />of Craig near the Yampa River. <br /> <br />The first alternative is to increase the dam height to 70 feet and raise the <br /> <br />reservoir surface elevation to 6355 feet. This change would increase the sur- <br /> <br />face area to 385 acres and the total capacity to 9,580 acre-feet. This con- <br /> <br />figuration will provide emergency storage capacity for two 350,000 kilowatt (net) <br />generating units, and is estimated to have an additional cost of $317,000 for <br /> <br />an estimated total project cost of $769,000. <br /> <br />The second alternative is to increase the dam height to 80 feet and raise the <br /> <br />reservoir surface elevation to 6364 feet. This change would increase the <br /> <br />surface area to 440 acres and the total capacity to 13,560 acre-feet. This <br /> <br />configuration will provide emergency storage capacity for four 350,000 kilowatt <br />generating units, and is estimated to have an additional project cost of <br /> <br />$572,000 for an estimated total project cost of $1,024,000. <br /> <br />It should be emphasized that these proposals are for emergency water storage <br /> <br />only. The normal water demand for the steam electric generating plant will be <br /> <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.