Laserfiche WebLink
<br />I, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CONTENTS <br /> <br />SUMMARY <br /> <br />PURPOSE AND SCOPE <br /> <br />PART 1 - FEASIBILITY REPORT <br /> <br />I. REVIEW OF THE ELKHEAD CREEK DAM AND RESERVOIR PROPOSED BY <br />COLORADO DIVISION OF WILDLIFE <br /> <br />1. Expected Life of the Project <br />2. Type and Design of the Dam <br />3. Spillway Capacity <br />4. Outlet Work Capacity <br /> <br />II. STORAGE REQUIREMENTS FOR PLANT WATER SUPPLY <br /> <br />Ill. FEASIBILITY OF ENLARGING TIlE ELKHEAD CREEK RESERVOIR' <br /> <br />1. Hydrology <br />2. Geology <br />3. Topography <br />4. Additional Land Acquisition <br />5. Estimated Additional Project Cost <br /> <br /> <br />IV. ADVANTAGES AND DISADVANTAGES OF AN ENLARGED RESERVOIR <br /> <br />1. Engineering <br />2. Ecology <br /> <br />V. CONCLUSIONS <br /> <br />PART 2 - PARTICIPATION AGREEMENT <br /> <br />APPENDIXES <br /> <br />APPENDIX A - Engineering Data and Drawings <br />APPENDIX B - Report on Water Rights <br />APPENDIX C - Soil and Geological Report <br />APPENDIX D - Elkhead Creek Dam Project Design Criteria <br /> <br />Page <br /> <br />i <br /> <br />Hi <br /> <br />1 <br /> <br />1 <br />1 <br />1 <br />1 <br /> <br />2 <br /> <br />3 <br /> <br />3 <br />4 <br />4 <br />5 <br />5 <br /> <br />6 <br /> <br />6 <br />6 <br /> <br />8 <br />