My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00367
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:26:46 AM
Creation date
10/5/2006 11:51:37 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153361
Contractor Name
Kelton Heights Water & Sanitation District
Contract Type
Loan
Water District
8
County
Jefferson
Bill Number
SB 80-67
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br />I <br />I <br />I <br />I <br /> <br />CHAPTER V <br /> <br />ESTIMATED COST <br /> <br />Cost of Construction <br /> <br />Unit construction costs were derived using construction costs of <br />related projects in the area. Table 11 gives unit costs and total cost <br />for each item of construction as of fall 1979. Projected construction <br />costs are given for 1980 and 1981 to show cost escalations due to <br />possible delay in award of the construction contract. Escalation fac- <br />tors were detenni ned usi ng a graph of "Colorado Buil di ng Construct i on <br />Cost Increase Averages" for 1967 through mid-1979 and projected to <br />1985. <br /> <br />The majority of cost for this prOject is for furnishing and installing <br />pipe. rxcavation conditions and pipe quantities have been established <br />with reasonable accuracy, thus a minimum contingency factor of 15 <br />percent can be applied. No extra costs for right-of-ways is expected <br />because all pipe will be installed within existing street rights-of- <br />way. An increase of 10 percent is added for engineering and design. <br />"Summary of Estimated Project Costs" is given in Table 12 including <br />engineering and contingency. <br /> <br />Fund Requirement Schedule <br /> <br />The estimated construction time is 6 months and the estimated design <br />time is 6 months including contract award. All funding will be needed <br />for the year in which the construction contract is awarded. 1980 is <br />expected to be the year in wh i ch project fundi ng is requi red assumi ng <br />no delays. <br /> <br />Operation Maintenance and Replacement Costs <br /> <br />Operations, maintenance and replacement (OM&R) expenditures of 1974 <br />through 1977 for Kelton Heights Water District are given in Table 13. <br />The expenditures are separated into 4 categories: 1) maintenance, <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.