Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 10 <br />CONSTRUCTION COSTS <br /> <br />Item <br /> <br />Quantity <br /> <br />Unit Price <br /> <br />Cost <br /> <br />*Asbestos-Cement Pipe <br />6-inch <br />8-inch <br /> <br />8,770 lin.ft. <br />2,100 1in.ft. <br /> <br />$21.69/1 in.ft. <br />$24.13/1 in.ft. <br /> <br />$190,200 <br />50,700 <br /> <br />Concrete Cut & <br />Rock Excavation <br /> <br />1,600 yd.3 <br /> <br />$25.00/yd3 <br />$1,612/ea. <br /> <br />40,000 <br />9,700 <br /> <br />Hydrants <br /> <br />6 each <br /> <br />Line Valves <br />6-inch <br />8-inch <br /> <br />Service Reconnect <br /> <br />167 each <br /> <br />$370/ea. <br />$522/ ea. <br /> <br />$250/ea. <br /> <br />$175/ea. <br /> <br />3,700 <br />1,600 <br /> <br />10 each <br />3 each <br /> <br />Main Reconnect <br /> <br />17 each <br /> <br />4,250 <br />29 ,250 <br />$329,400 <br />$362,400 <br />$385,400 <br /> <br />Construction Cost 1979 <br /> <br />Construction Cost 1980 (escalation 1.10) <br />Construction Cost 1981 (escalation 1.17) <br /> <br />*A11 pipe items include cost for excavation, pipe, fittings, backfill <br />and asphalt paving <br /> <br />23 <br />