My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00354
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00354
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:10:52 AM
Creation date
10/5/2006 11:51:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153754
Contractor Name
Southeastern Colorado Water Conservancy District
Contract Type
Grant
Water District
0
County
Lake
Chaffee
Fremont
Pueblo
El Paso
Bill Number
SB 99-173, SB 96-170
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Study Goal and Objectives <br /> <br />Study Goal-The goal of the Assessment Project is to determine the <br />future demand for storage and water sLlpplies for the municipal and agricultural <br />water users within the boundaries of the Southeastern Colorado Water <br />Conservancy District (Arkansas River Basin), and provide direction on how best <br />to meet those demands, <br /> <br />Study Objectives-The following is a general listing of the individual <br />study objectives/tasks. The contractor shall complete the tasks as stated in the <br />Scope of Work and present general findings and recommendations concerning <br />the future water and storage requirements for the entities identified on Exhibit A <br />of the Scope of Work document. The attached Scope of Work provides a <br />detailed description of each listed assessment task, <br /> <br />1, Review existing studies and reports for proper incorporation into the <br />Assessment Report <br />2. Describe current water systems for municipal and industrial entities <br />3. Develop population projections -years 2000,2010,2020 and 2040 <br />4, Determine agricultural water use from existing reports and records <br />5, Determine current and potential water conservation efforts <br />6. Project monthly water demand through the year 2040 for each <br />municipal and industrial entity <br />7. Compare monthly water use projections with Current system monthly <br />firm yield for each entity <br />8. Determine the need for additional water supplies for each entity <br />9. Determine the storage requirements for each entity <br />10. Determine the extent to which Fryingpan-Arkansas Project supplies <br />and facilities assist in meeting projected water and storage demands <br />11, Perform reconnaissance level investigations of potential water storage <br />and supply alternatives <br />12, Identify factors to be considered for each water storage and supply <br />alternative <br /> <br />The proposal should identify the approximate time it will take to complete each <br />task as listed in the Scope of Work, And, the proposal should offer comments on <br />additional Scope of Work items, or the elimination of any listed items. which you <br />believe can better achieve the Project goals and objectives as stated, <br /> <br />Available Information -Much of the preliminary information needed to <br />begin this Assessment Project will be made available to the contractor as a part <br />of the Scope of Work Relevant Documents, Studies and Reports (Exhibit B), <br />Indicate in your proposal what additional information you will need to perform the <br />initial tasks of the Assessment, and how the Enterprise may assist in gathering <br />the needed information and data. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.