My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153770 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153770 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 2:34:54 PM
Creation date
10/5/2006 11:50:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153770
Contractor Name
Summit Reservoir and Irrigation Company
Contract Type
Loan
Water District
32
County
Montezuma
Bill Number
SB 97-008
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' <br />�� <br />' <br />' <br />, <br />' <br />' <br />' <br />, <br />� <br />, <br />' <br />' <br />' <br />' <br />, <br />' <br />, <br />' <br /># <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />POSSIBLE FACILITIES AND ESTIMATED CONSTRUCTION COSTS <br />Turkey Creek Diversion <br />Lost Canyon Diversion <br />Rail Road Siphon <br />Ditch Lining <br />Ditch Lining <br />Summit to Puett Conveyance <br />Wallace Drop <br />Walker Drop <br />Joe Moore Measuring Flume <br />Turkey Creek Measuring Flume <br />South Main Ditch <br />Rail Road Siphon Safety Protection <br />Summit Dam Outlet Repair <br />Misc. System Upgrades <br />Capacity_ _Le�h�ft) Type of Repair <br />60 cfs Repair <br />129 cfs Repair <br />129 cfs 200 Replace Siphon <br />129 cfs 1000 Install Pipe in Ditch <br />129 cfs 1000 Install Pipe in Ditch <br />50 cfs 5000 Enlarge Highway Culvert <br />19.1 cfs 100 Construct Drop <br />14.1 cfs 100 Construct Drop <br />60 cfs Install Flume <br />60 cfs Install Flume <br />? cfs 14000 Replace Ditch With Pipe <br />129 cfs Install Safety Cable <br />n/a Replace Gate and Line Pipe <br />n/a 10% Various Upgrades <br />Total Cost— <br />$8,000 <br />$15,000 <br />$123,000 <br />$50,000 <br />$50,000 <br />$72,000 <br />$43,000 <br />$24,000 <br />$2,000 <br />$2,000 <br />$140,000 <br />$2,000 <br />$80,000 <br />$32,000 <br />Subtotal <br />Contingencies (15%) <br />Engr, Admin, Etc (8%) <br />TOTAL ESTIMATED CONSTRUCTION COST <br />$643,000 <br />$96,000 <br />$59,000 <br />$800,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.