Laserfiche WebLink
' <br />, 11. If preliminary cost estimates have been made, please indicate the estimated cost of the <br />project (if known): <br />' The preliminary estimated cost, subject to final designs by USBR, is shown on the attached table <br />and is $800,000. The Company would propose to have a"line of credit" of about $800,000 <br />' available during the next about 7 yeazs to perform the proposed activities. <br />12. Are you intending to apply for a feasibility study loan from the CWCB Construction Fund? <br />The Company, with this application, is applying for funds to prepaze a feasibility report from the <br />Small Dams Program for 50% of up to $4,000. The estimated feasibility study cost is shown on <br />an attached table. <br />