Laserfiche WebLink
� <br />, <br /> � <br />SUMMIT RESERVOIR & IRRIGATION COMPANY <br />ESTIMATED FEASIBILITY STUDY COST <br />' Item <br />Review SCS Evaluations <br />, Feability Design of Facilities <br />Prepare Dam Safety Report for Outlet Lining <br />Prepare Cost Estimates <br />, Prepare CWCB Feasibility Report <br />Attend CWCB and Company Meetings <br />Travel and Direct Expenses <br />' <br />Total <br />Total Cost <br />$210 <br />$980 <br />$420 <br />$350 <br />$560 <br />$700 <br />$750 <br />$3,970 <br />Note: Approximately $1,000 is included for attendance at a CWCB meeting. <br />Attempts will be made to combine this trip with other work so that the <br />amount can be reduced. <br />