Laserfiche WebLink
<br />"> <br /> <br />. <br /> <br />. <br /> <br />Agenda Item 22 <br />March 15. 1988 <br /> <br />JWM/gl <br />Enclosure: <br /> <br />(2) <br /> <br />(3 ) <br /> <br />The Board's cost shall be considered a part of the <br />total cost of any project identified in the study if <br />such project is subsequently built by the county with <br />construction fund money, or the Board's cost shall be <br />repaid in full with interest at 5 percent per annum <br />if construction on such a project is initiated by the <br />county within ten years without the benefit of <br />construction fund money. and <br /> <br />The contract between the Board and the county for <br />study funding shall provide that the study cannot be <br />used by either party in any litigation concerning <br />applications by the Board for instream flow water <br />rights on any stream in the Blue River Basin. <br /> <br />as stated <br /> <br />-2- <br />