<br /> <br />, ' <br /> <br />..' <br /> <br />'{,; <br /> <br />. <br /> <br />. <br /> <br />Task Descriptions <br /> <br />The Contractor shall be responsible for performing all of <br />the work tasks listed below in accordance with the descriptions <br />given for each work task. The eleven major tasks with associated <br />subtasks are: <br /> <br />Tasks <br /> <br />Estimated Labor <br />Man-Weeks <br /> <br />1. project Administration and Control <br /> <br />14 <br />8 <br />'7 <br />7 <br />21 <br />17 <br />13 <br /> <br />2. Project Meetings <br /> <br />3. Review of Existing Data <br />4. Geology and Geotechnical Investigations <br />5. Preliminary Dam' and Spillway Design <br /> <br />6. Preliminary Reservoir Design <br /> <br />7. Analyses of Alternative Uses <br /> <br /> <br />8. Water Rights Analyses <br /> <br /> <br />9. Reservoir Operation S~udies <br /> <br /> <br />10. Economic Evaluations <br /> <br />7 <br /> <br />8 <br />19 <br /> <br />11. Report Preparation <br /> <br />16 <br />137 <br /> <br />The estimated work effort in man-weeks for each task may be <br />revised to change emphasis among tasks. These revisions are <br />subject to the procedures outlined in paragraph 9 of the <br />contract. <br /> <br />Task 1 - Project Administration and Control <br />For this task the Contractor shall: <br /> <br />a. Prepare a detailed Plan of Study (POS). The POS shall <br />address, in detail, the study tasks, schedule, budget, <br />milestones, task products and coordination with the <br />State. <br /> <br />b. Coordinate and integrate the work of project <br />team members and subcontractors. <br /> <br />c. Monitor and control expenditures by task. <br /> <br />-2- <br />