Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Exhibit I - Scope of Services <br />Metropolitan Water Supply Investigation <br /> <br />November 17, 1993 <br />Page 18 <br /> <br />capability or by using an already developed capability, such as that being developed by <br />Denver. This determination would be made at the end of the scoping process, <br /> <br />This model would then be used in a collaborative setting to conduct extensive analyses <br />of system integration possibilities in a cooperative and "shared information" setting, This <br />aspect of the MWSI Project could be coordinated with Denver's anticipated planning efforts, <br /> <br />Concurrent with modeling analyses, investigations of the facilities-related needs, <br />environmental impacts and institutional aspects of the most promising system integration <br />opportunities would be conducted. <br /> <br />The results of the MWSI Project would then be documented in a report to the State, <br /> <br />Project Administration <br /> <br />Project Team Member Firms <br /> <br />The Project Team member firms include Hydrosphere Resource Consultants, Inc" HRS <br />Water Consultants, Inc., Mulhern MRE, Inc" Spronk Water Engineers, Inc, and ECL The <br />roles of the respective Team member firms are presented and discussed in the Team <br />Organization section of this Proposal, <br /> <br />Team Organization <br /> <br />The organization of the Project Team is presented in the Team Organization section of <br />th is Proposal, <br /> <br />Coordination and Reporting <br /> <br />The Project Manager, Mr. Lee Rozaklis, will have regular responsibility for Project <br />coordination and reporting with the Project Management Team and T AC. Coordination and <br />reporting are discussed in the Team Organization and Coordination sections of this Proposal. <br /> <br />In order to ensure clear communications and reporting between the Contractors, the <br />Project Management Team and T AC, it is recommended that a single State Project Leader and <br />a T AC chairperson be designated, <br /> <br />Project Schedule <br /> <br />The Project schedule is presented in the Scheduling section of this Proposal. <br /> <br />Work Products <br /> <br />The work products of the MWSI Project will consist primarily of meetings, documents <br />(technical memoranda and reports), data sets, and, ,. ;";]puter model. Each of these areas are <br />discussed in specific Task descriptions, Project wOfk products will be more specifically <br />defined during the Scoping phase of the Project. <br />