My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00318
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2011 3:02:57 PM
Creation date
10/5/2006 11:49:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153618
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The City, together with ~lKE, selectetl Alternative No.2, In combination with <br />the auxll I ary spf1lway solution of Alternative 110. 1. The rehabilitation <br />solution would Include: raise the dam and dike crests one foot; reduce, <br />control" and collect dam embankment and foundation seepage; flatten upstream <br />slope; replace outlet gate and Inlet and outlet structures; re-llne outlet <br />works conduit with grouted steel liner; provide RCC auxiliary spillway <br />overflow crest and downstream apron, flatten upstream slope, of auxll lary dike <br />and overflow section, and control and collect seepage downstream of the <br />auxiliary spillway. The estimated appraisal-level construction cost, <br />Including 25 percent contingency, was $500,000. <br /> <br />^ feasibility-level design for rehabilitating Peterson lake Oam was elaborated <br />based on the alternative selected. Design computations were refined, and <br />drawings prepared. A construction cost estimate was developed by <br />recalculating quantities and reviewing unit costs. The estimated construction <br />cost for rehabilitating Peterson lake Dam, Including a 15 percent contingency, <br />Is $583,251. <br /> <br />Total project costs were developed by adding the cost of the feasibility study <br />to the estimated cost for engineering and construction management, all0\11ng <br />for cost escalation due to Inflation, and computing Interest during project <br />execution. The total estimated cost to rehabilitate Peterson lake Dam, so <br />that It can operate to Its full decreed capacity of 1,252 acre-feet of total <br />storage without restriction, Is $756,312. This amounts to a unit cost per <br />acre-foot of total storage of $604 and a cost of $749 per acre-foot of firm <br />annual yield. These unit costs are compared In the fol1o\1lng table \1ith the <br />estimated total costs to rehabilitate Comanche and Twin lakes Dams. <br /> <br />Ix <br />
The URL can be used to link to this page
Your browser does not support the video tag.