Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />=================================================~======================================= <br /> <br />AL TERUATlVE <br /> <br />----------------------------------------------------------------------------------------- <br />----------------------------------------------------------------------------------------- <br /> <br />DESCRIPTION <br /> <br />ESTII4ATED COST <br />ItICLUDHlG 25% COIlTlNGEUCY <br /> <br />1 <br /> <br />2 <br /> <br />3 <br /> <br />Replace dam, outlet works, and service <br />spil1l1ay with RCC dam. Grout dam foundation <br />rock. Set crest of dam at elevation 951B. <br />Incorporate outlet works and service spillway <br />for 100-year flood into RCC dam. Repair ex- <br />isting auxiliary spillway by constructing RCC <br />overflow crest and downstream apron, flattening <br />upstream slope of dike and overflow section using <br />rockfill, and installing filter blanket and toe <br />drain beneath RCC apron. <br /> <br />$ 1,050,000 <br /> <br />- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> <br />Replace outlet conduit with grouted steel liner. <br />Replace Inlet and outlet structures and gate. <br />Repair wet well. Raise darn crest one foot. In- <br />stall filter blanket and toe drain system In <br />downstream shell and construct downstream berm. <br />Remove exi st I ng ri prap from upstream face, and <br />flatten slope, and place soil cement on upstream <br />face. Repair existing auxiliary spillway by con- <br />structing impervious cut off, providing rockfill <br />overflow crest and downstream slope, flatten <br />upstream slope, and install filter blanket and toe <br />drain on downstream slope. <br /> <br />$ 515,800 <br /> <br />- - - - - - - - - - - - - - - - - - - - - - <br /> <br />Repair outlet works conduit and wet well. Re- <br />place inlet and outlet structures and raise dam <br />crest one foot. Install filter blanket and toe <br />drain system in downstream shell, and construct <br />do,mstrearn berm. Remove rI prap from upstream <br />face and flatten slope. Replace bedding and rlprap. <br />Repair and utilize existing auxiliary spillway by <br />flattening downstream slope and providing rockfi11 <br />overflow crest and downstream slope, flatten up- <br />stream slope of dike and overflow section and <br />Install filter blanket and toe drain beneath rockflll. <br /> <br />$ 346,000 <br /> <br />========================================================================================= <br /> <br />vffl <br />