Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Cost of construction <br /> <br />CHAPTER V <br />ESTIMATED COSTS <br /> <br />The estimated cost of construction at March 1975 prices is $4.55 million. <br /> <br /> <br />An itemization of this total, derived from conferences with contractors and <br /> <br /> <br />materials suppliers, is set forth in Table 5. <br /> <br />Table 5. Estimated Construction Costs <br /> <br />Item <br /> <br />1. 15" AC Pipe <br />2. 12" AC Pipe <br />3. 10" AC Pipe <br />4. 8" PVC Pipe <br />5. 6" PVC Pipe <br /> <br />6. 4" PVC Pipe <br />7. 2" PVC Pipe <br />8. Taps and Meters <br />9. Hydrants <br />10. 12" Valve <br /> <br />11. 8" Valve <br />12. 6" Valve <br />13. 4" Valve <br />14. Air Relief <br />15. Pressure Relief <br /> <br />16. 12" Pressure Red. Valve <br />17. 8" Pressure Red. Valve <br />18. 4" Pressure Red. Valve <br />19. 500,000 gal. Reservoir <br />20. 1,000,000 gal. Reservoir <br /> <br />21. Pumps - 5 hp <br />22. Supply System * <br />23. R. R. Crossing <br />24. River Crossing <br />25. Road Crossing <br /> <br />26. Highway Crossing <br />27. Interstate Crossing <br />28. Road Repair <br />29. Encasement <br />30. 2" Valves <br /> <br />31. Canal Crossing <br /> <br />Quantity Unit <br /> <br />51,200 <br />50,200 <br />8,800 <br />174,800 <br />344,100 <br /> <br />376,400 <br />482,400 <br />1,800 <br />32 <br />7 <br /> <br />4 <br />8 <br />61 <br />67 <br />50 <br /> <br />1 <br />4 <br />11 <br />1 <br />1 <br /> <br />2 <br />1 <br />16 <br />5 <br />200 <br /> <br />450 <br />5 <br />200 <br />1,200 <br />70 <br /> <br />74 <br /> <br />LF <br />LF <br />LF <br />LF <br />LF <br /> <br />LF <br />LF <br />Ea. <br />Ea. <br />Ea. <br /> <br />Ea . <br />Ea. <br />Ea. <br />Ea. <br />Ea. <br /> <br />Ea. <br />Ea. <br />Ea. <br />Ea. <br />Ea. <br /> <br />Ea. <br />LS <br />Ea. <br />Ea. <br />Ea. <br /> <br />Ft. <br />Ea. <br />SY <br />CY <br />Ea. <br /> <br />Ea. <br /> <br />Unit Cost <br /> <br />Cost <br /> <br />11.00 <br />6.75 <br />5.75 <br />3.15 <br />2.15 <br /> <br />1.40 <br />0.90 <br />210.00 <br />500.00 <br />550.00 <br /> <br />250.00 <br />190.00 <br />140.00 <br />550.00 <br />600.00 <br /> <br />3,000.00 <br />1,000.00 <br />550.00 <br />125,000.00 <br />200,000.00 <br /> <br />7,000.00 <br />90,000.00 <br />5,000.00 <br />27,000.00 <br />60.00 <br /> <br />150.00 <br />15,000.00 <br />9.00 <br />40.00 <br />100.00 <br /> <br />60.00 <br /> <br />$563,200 <br />338,850 <br />50,600 <br />550,620 <br />739,815 <br /> <br />526,960 <br />434,160 <br />378,000 <br />16,000 <br />3,850 <br /> <br />1,000 <br />1,520 <br />8,540 <br />36,850 <br />30,000 <br /> <br />3,000 <br />4,000 <br />6,050 <br />125,000 <br />200,000 <br /> <br />14,000 <br />90,000 <br />80,000 <br />135,000 <br />12,000 <br /> <br />67,500 <br />75,000 <br />1,800 <br />48,000 <br />7,000 <br /> <br />4,440 <br /> <br />Total <br /> <br />$4,552,755 <br /> <br />*Supply system includes 4 wells, pumps, controls, <br />chlorination equipment, surge tanks, pump houses and <br />0.1 mg storage tank. <br /> <br />-15- M. W. BITTINGER AND ASSOCIATES, INC. <br />