<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />
<br />Cost of construction
<br />
<br />CHAPTER V
<br />ESTIMATED COSTS
<br />
<br />The estimated cost of construction at March 1975 prices is $4.55 million.
<br />
<br />
<br />An itemization of this total, derived from conferences with contractors and
<br />
<br />
<br />materials suppliers, is set forth in Table 5.
<br />
<br />Table 5. Estimated Construction Costs
<br />
<br />Item
<br />
<br />1. 15" AC Pipe
<br />2. 12" AC Pipe
<br />3. 10" AC Pipe
<br />4. 8" PVC Pipe
<br />5. 6" PVC Pipe
<br />
<br />6. 4" PVC Pipe
<br />7. 2" PVC Pipe
<br />8. Taps and Meters
<br />9. Hydrants
<br />10. 12" Valve
<br />
<br />11. 8" Valve
<br />12. 6" Valve
<br />13. 4" Valve
<br />14. Air Relief
<br />15. Pressure Relief
<br />
<br />16. 12" Pressure Red. Valve
<br />17. 8" Pressure Red. Valve
<br />18. 4" Pressure Red. Valve
<br />19. 500,000 gal. Reservoir
<br />20. 1,000,000 gal. Reservoir
<br />
<br />21. Pumps - 5 hp
<br />22. Supply System *
<br />23. R. R. Crossing
<br />24. River Crossing
<br />25. Road Crossing
<br />
<br />26. Highway Crossing
<br />27. Interstate Crossing
<br />28. Road Repair
<br />29. Encasement
<br />30. 2" Valves
<br />
<br />31. Canal Crossing
<br />
<br />Quantity Unit
<br />
<br />51,200
<br />50,200
<br />8,800
<br />174,800
<br />344,100
<br />
<br />376,400
<br />482,400
<br />1,800
<br />32
<br />7
<br />
<br />4
<br />8
<br />61
<br />67
<br />50
<br />
<br />1
<br />4
<br />11
<br />1
<br />1
<br />
<br />2
<br />1
<br />16
<br />5
<br />200
<br />
<br />450
<br />5
<br />200
<br />1,200
<br />70
<br />
<br />74
<br />
<br />LF
<br />LF
<br />LF
<br />LF
<br />LF
<br />
<br />LF
<br />LF
<br />Ea.
<br />Ea.
<br />Ea.
<br />
<br />Ea .
<br />Ea.
<br />Ea.
<br />Ea.
<br />Ea.
<br />
<br />Ea.
<br />Ea.
<br />Ea.
<br />Ea.
<br />Ea.
<br />
<br />Ea.
<br />LS
<br />Ea.
<br />Ea.
<br />Ea.
<br />
<br />Ft.
<br />Ea.
<br />SY
<br />CY
<br />Ea.
<br />
<br />Ea.
<br />
<br />Unit Cost
<br />
<br />Cost
<br />
<br />11.00
<br />6.75
<br />5.75
<br />3.15
<br />2.15
<br />
<br />1.40
<br />0.90
<br />210.00
<br />500.00
<br />550.00
<br />
<br />250.00
<br />190.00
<br />140.00
<br />550.00
<br />600.00
<br />
<br />3,000.00
<br />1,000.00
<br />550.00
<br />125,000.00
<br />200,000.00
<br />
<br />7,000.00
<br />90,000.00
<br />5,000.00
<br />27,000.00
<br />60.00
<br />
<br />150.00
<br />15,000.00
<br />9.00
<br />40.00
<br />100.00
<br />
<br />60.00
<br />
<br />$563,200
<br />338,850
<br />50,600
<br />550,620
<br />739,815
<br />
<br />526,960
<br />434,160
<br />378,000
<br />16,000
<br />3,850
<br />
<br />1,000
<br />1,520
<br />8,540
<br />36,850
<br />30,000
<br />
<br />3,000
<br />4,000
<br />6,050
<br />125,000
<br />200,000
<br />
<br />14,000
<br />90,000
<br />80,000
<br />135,000
<br />12,000
<br />
<br />67,500
<br />75,000
<br />1,800
<br />48,000
<br />7,000
<br />
<br />4,440
<br />
<br />Total
<br />
<br />$4,552,755
<br />
<br />*Supply system includes 4 wells, pumps, controls,
<br />chlorination equipment, surge tanks, pump houses and
<br />0.1 mg storage tank.
<br />
<br />-15- M. W. BITTINGER AND ASSOCIATES, INC.
<br />
|