My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00296
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00296
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:16 AM
Creation date
10/5/2006 11:48:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153418
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-+ <br /> <br />hoped these decisions can be made during a proposed review meeting <br />approximately June 20. <br /> <br />4. <br /> <br />Identification of project benefits. This subject will be addressed in <br /> <br /> <br />terms of the number of acres of supplemental and full servic:e land <br /> <br /> <br />which can be served by each of the project components. Dollar values <br /> <br /> <br />of benefits that might result from different management strategies <br /> <br /> <br />such as sprinkler irrigation, reuse, exchanges, rotation or scheduling <br /> <br /> <br />procedures, will be addressed in qualitative terms only. In general, <br /> <br /> <br />the benefits frolt such procedures will be measurable in terms of <br /> <br /> <br />additional acreage served. <br /> <br />5. <br /> <br />Preparation of the final report. The report format will follow to <br /> <br /> <br />some extent, the outline provided in the guidelines published by the <br /> <br /> <br />Colorado Water conservation Board. However, since this is to be an <br /> <br /> <br />appraisal level, rather than a feasibility report, certain sections <br /> <br /> <br />will be eliminatec or treated only briefly. The report will contain <br /> <br /> <br />an executive SullIlt.2ry, a main body which presents the information <br /> <br /> <br />developed in the course of the study, and appendices which provide <br /> <br /> <br />back-up information. A tentative report outline is presented in <br /> <br /> <br />paragraph G of this section. <br /> <br />D. Project Features <br /> <br />Project features analyzed in the current study will be grouped in several <br />more or less independent systems: <br /> <br />Gurley Ditch syste::o improvement and expansion including Beaver Creek <br />Reservoir and/or existing Gurley Reservoir enlargement. <br /> <br />Lilylands systelt improvements including Lilylands Reservoir <br /> <br /> <br />enlargement, Wheeler Reservoir, and enlargement and extension of <br /> <br /> <br />Lilylands Canal (full' development of this system will be dependent <br /> <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.