Laserfiche WebLink
<br />1-2 <br /> <br />. <br /> <br />. water meters in the existing Town, and <br /> <br /> <br />. water rights work, including acquisition <br /> <br /> <br />lhe second phase project is integrated with the initial <br /> <br /> <br />is in accordance with the Carbondale Water Mater Plan. <br /> <br /> <br />of the second phase project is $770,000. <br /> <br />phase project and <br />The estimated cost <br /> <br />CONCLUSION <br /> <br />The project, as described herein, is necessary to insure the Town of <br /> <br /> <br />Carbondale a depend~ble water IJtility system. The project provides a <br /> <br /> <br />"ubstantial legal and physical base cf water supply and the faci I ities to <br /> <br /> <br />treat, transmit, and distribute water where it is needed. The project is <br /> <br /> <br />feasible as shown followin9, and the Town's water fund will be able to <br /> <br /> <br />support advance payments, even when using very conservative revenue fore- <br /> <br /> <br />casting. <br /> <br />. <br /> <br />. <br /> <br />L <br />