My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02000000008 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
02000000008 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2010 10:36:33 AM
Creation date
10/5/2006 11:47:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
02000000008
Contractor Name
Lake Canal Reservoir Company
Contract Type
Grant
Water District
0
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' <br />' <br />, <br />' <br />, <br />, <br />, <br />' <br />' <br />' <br />' <br />, <br />' <br />' <br />' <br />' <br />' <br />IMPLEMENTATION SCHEDULE <br />The following schedule is proposed for implementation of the project based on the two phases as <br />outlined above. <br />Tar et�Com_pletion Date <br />2/15/Oi <br />1/28/02 <br />8/1/02 <br />6/1/02 <br />10/1/02 <br />4/1/03 <br />5/1/03 <br />6/15/03 <br />7/15/03 <br />11/15/03 <br />Task <br />1. Feasibility Study <br />2. Loan Approved By CWCB <br />3. Loan Finalized By CWCB <br />4. Start Design <br />5. Finish Design <br />6. Review By SEO <br />7. Projec[ Bid <br />8. Award Bid <br />9. Start Construction <br />10. Complete Construction <br />SOCIAL, ECONOMIC, AND PHYSICAL IMPACTS <br />The project will have some social impacts as the facility is expected to be utilized for recreational <br />opportunities. No other significant social nnpacts are expected. <br />The project will have a positive economic impact by providing an additional 111 acre-feet of water <br />for irrigation in the Company's service area. <br />The project will have no significant physical impacts except in the immediate vicinity of the <br />construction. These impacts will be minor in nature and will affect an area of less than 10 acres. <br />PERMITTING <br />The Company and the Engineer believe no Environmental Assessment (EA) or Environmental <br />Impact Statement (EIS) will be required. The Corps of Engineers will be contacted concerning <br />404 permitting but anticipate the work falling under the Nation Wide Permits which will not <br />require formal permitting. <br />INSTITUTIONAL CONSIDERATIONS <br />No institutional considerations exist other than the proposed loan from the CWCB. <br />' Gray Lake-Feasibility Study <br />L1 <br />Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.