Laserfiche WebLink
' <br />' <br />� J <br />' <br />� 1 <br />1 <br />C�' <br />' <br />' <br />1 <br />' <br />' <br />� <br />t <br />1 <br />' <br />' <br />' <br />TABLE 5 <br />GRAY NO. 3 <br />BREACH DAM <br />iJNIT <br />[TEM DESCRIPTION QUANTITY UNITS PffiCE AMOUNT <br />1. Mobilization, Insurance, Bonds 1.00 L.S. $2,000.00 $2,000 <br />2. Breach Excavation 1800.00 C.Y. $2.00 $3,600 <br />3. Spoil 1800.00 C.Y. $1.00 $I,800 <br />4. Seeding 2.00 Acres $2,000.00 $4,000 <br />TOTAL CONSTRUCTION COST <br />Engineering <br />OPINION OF TOTAL COST <br />$11,400 <br />$6,000 <br />$17,400 <br />, <br />