Laserfiche WebLink
<br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />5 - SCHEDULE FOR STAGING IMPROVEMENTS <br /> <br />Due to the lengthy time delays ,in obtaining funding for a public works project <br />of this type and considering the various time spans involved for preparation of <br />design plans, right-of-way and land acquisition, financing arrangements, plan <br />reviews and approvals, advertisement for bids, etc., the most probable period of <br />construction of the first improvement project would be in 1977-1978. Stage I <br />construction (1977-1978) is shown on Plate II with construction quantities and <br />costs shown later in this report. Stage IA construction consists of installation <br />of a second:reverse osmosisunit.iThe scheduled date for Stage IA construction <br />is approximately 1985. The estimated cost for the Stage IA construction is <br />shown later in this report. . Stage II construction (1995) is shown on Figure <br />III with quantities and costs shown later in this report. <br /> <br />-32- <br />