Laserfiche WebLink
<br />I' <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />In addition to the permanent area needed for each facility, additional room is <br />needed for construction activities. The following is a listing of the sites needed. <br /> <br /> , ' Construction <br /> Easement <br />Facility Permanent Site (Approximate) <br />Tank 113 50' x 50' minimum. 150' x 150'* <br />Tank 114 50' x 50' minimum 150' x 150'* <br />**R.O. Plant /11 75' x 150' minimum 150' x 150'* <br /> <br />* The total 150' x 150' construction easement includes the permanent site. If at, <br />all possible, the entire 150' x 150' site should be purchased as a permanent site. <br />the dimensions shown for permanent sites are the minimum required for the facility <br />installation and do not include minimum clearance requirements from any existing <br />sanitation facilities such as septic tanks and leaching fields. <br /> <br />** This site is shown on Plate II as an alternate site and would be necessary only <br />if the primary site proves to be inadequate in size. <br /> <br />-31- . <br />