My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stagecoach Mitigation Grant
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
Stagecoach Mitigation Grant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:37 AM
Creation date
10/5/2006 11:47:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153569
Contractor Name
Upper Yampa Water Conservancy District
Water District
0
County
Routt
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STAGECOACiI RES ERVO[R PROJ ECi - ECP <br />Commitme n[5 7/. <br />16-DEC-88 14:57:79 Pg 6 <br />Reference Page Project Stage <br />Document Number <br />Responsible Comments ' <br />f MOnita ring)1/ and <br />Party Commitment Status ' <br />Dsgn Const ObM <br />approved by the COE prior the Start of <br />construction. <br />21. UYWCD will provide up Ca 51,000 annually to <br />the OOW for development, operation, and <br />maintenance of the vaterf owl development for <br />the life of the project. 9/ <br />USER) <br />-If/2/88 meeting: deter. on final no. of <br />acres will be as a result of monico ring. <br />FES 187, 184 X X X UYWCD (GJ 150) -4/28/87 It r: UYWCD to LBean--UY will <br />755, 757 manage 80~ a. in upper end, <br />-11/17/67 UYWf,D has opted to take on <br />the development, operation and <br />maintenance wmmitme. nt themselves. <br />Riparian Area Below and Ahove Dam <br />??7???????......STATUS: COMPI.ETE......1?77?77117 . .......... .................... ................................... <br />................ .. .......... <br />22. UYWCD will install (ishe ry habitat FES 16, JBJ, X - <br />X X UYWCD (GJ150) Il/Il/A7 meeting: B. Emblad stated • <br />imp rovemenc s[nlc [u res in the Ynmpa River, on 756 that DOW will write letter stating <br />all land owned or controlled by the UYWCD, that DOW will be responsible for <br />immediate ly upstream and downstream of LGA VI-4 placing imp rovement structures (rocks) <br />Stagecoach Dam and Reservoir, and on all App Q Q if UYWCD will provide in the amount, <br />public land (DOW and BLM) between Stagecoach size. and at the locations specified <br />Dam and Catamount Reservoir IO/. by DOW. <br />- Plans and Specifications must be completed -7/10/88 Above letter was writCe n. <br />by UYWCD and aDP roved by DOW and COE prior Co -5/11/88 Ltr: Dow to UYWCD states DOW <br />start of installation of improvement structures. will have conceptual plans completed <br />- Construction of imp rovement structures will summer 1998. <br />~ <br />be completed prior to filling of reservoir. n <br />-9/6/88 DOW sends out above pL <br /> -I 1/2/88 As soon as Emblad send Letter appr, existing work <br /> status of this commitment would De marked complete. <br /> -12/9/88 telex LDean to BEmblad--Bill will send Rr app ruing <br />??7???????......STATUS: COMPI,ETE......17T177111T . .......... ................... ..............................:...................................g.. <br />[IYWCD will develop plans and specifications 404 <br />27 Ja X % X UYWCD (CJ 1901 x/22/87 1[r. UYWCD to CnF--suhmits m t <br />. <br />far the management of 17 acres below [he dam LGA App. Q. plan to include; UFence in 89 to ezc 1. <br />to enhance the wetland and riparian cattle. 2)UY co main[. fence, 3)Photos <br />functions. These plans are to approved by ~ record of progress <br />COE prior to construction and WORK FINISHED -11/17/87 Flans not yet completed. <br />BEFORE FILLING STARTS. Monitoring plans and -6/1/89 Lt r. COE to UYWCD - Permit re <br /> <br />spec iCications for this area will be as per <br />that plans are complete before <br />~ <br />commitment 19. (i.e. photographic impoundment begins. <br /> -Il/2/88 meet: J Fetcher stated the 17 <br />documentation) <br />-LGA, APP• Q 1[--spec if Ted [hat on the l7 acre riparian corridor that acres had been fenced and a gate had <br />t) Flans and specs. complete and appr prior to start of install. of been placed to keep vehicles from enter <br />structures. 2) Construction completed prior to filling of reservoir the area. A transect will De used to <br />J) Cattle grazing excluded from this and adjoining wild life habitat area monitor vegeta [ion. <br /> -11/2/88 meet: B Miller questioned i[ 17 acres of wetlands <br /> existed in the area. J Fetcher contends that the area has <br /> been approved by EPA. COE was to analyse the issue. 1 <br /> -Il/8/88 Lt r. UYWCD to COE contains area mst plan shoving <br />required items have been completed. <br />-11/18/88 It r: UYWCD to COE--transec is have been placed <br />-I2/8/BA Itr: COE to UYWCD--because the question raised <br />on 11/2/88 is being [onside red COE is not commenting on <br />plans submited on II/8/88. <br />-12/7/88 ltr: COE to BRec--expresses concern that area is <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.