Laserfiche WebLink
STAGECOACiI RESERVOIR PROJECT - ECP 16-DEC-88 14:56:]9 P6 5 <br />Commitments 7/ <br />l7. UYWCD will submit reports to COE on the <br />status n[ mitigation measures which is <br />required through the Section 404 Permit. <br />Reference Page ProJec[ Stage Responsible Comments <br />Document Number (Nonitoring)1/ and <br /> Dsgn Coast ObN Party Commitment Status <br />_______________ <br />__________ ________ __________________ ________________ ________________________ <br />for authority). <br /> -II/2/88 meeting: P Eggleston stated he could acquire mgt. <br /> from TNC. <br />40G 7-ld X X % UYWCD (GJ180) -5/18/87 Copies to be provided to <br /> toopera[ing agencies. <br /> -]/10/88 Tele. Conv, w/ Cary Davis; <br /> reports are heinP, submitted to COE as <br /> scheduled in 404 permit. <br />Ie. UYWCi1 wilt acquire 78 acres at the wrst end FES S-J, S-4, X X <br />of the resr. rvoir (or waterfowl. With 16, 18, <br />assistance from DOP and DOW, the UYWCD will 19, 79, <br />develope a management plan including how 356 <br />access will be controlled in the 78 acre area <br />at [he nest end of Stagecoach Reservoir throughout <br />the year and during Ovate rfoul hunting season. <br />19. UYWCD will prepare plans for approval by COE FES 12J X X <br />for the development and management of 404 J, 32 <br />wetlands at the west end of the reservoir <br />showing: <br />- Not more than 10 acres of open water <br />- a schedule of completion of the wetlands <br />prior to the filling of the reservoir <br />- a vegetation plan which establishes <br />performance standards and establishes <br />vegetation prior to the first growing season <br />after the reservoir begins filling. <br />- future monitoring by permanently locating <br />reference points to photographically monitor <br />the relative success o[ mitigation of the <br />area. Photos are to be taken before, during, <br />and three years alter wetland constrac ti on, <br />the first weeks of August and submitted to <br />CUE on October 1 annually. <br />20. tf the above wetland aquatic preserve shows 404 3 X X <br />less than 78 acres as intended, alternative <br />measures will be developed by UYWCD and <br />X IIYWCD (GJI50) fFollowinP, re(e rs to commitment 18 b 19) <br />-4/22/87 It r. UYWCD [n COE--submits plan <br />-4/29/87 Itr: OSD to UYWC O--C Rai6 <br />realinement adds .54 a. to upper well <br />-5/6/87 It r. DOW to COE reviews plan and <br />makes recommendations <br />-5/17/88 Lt r. CDE to UYWC O--compliments <br />UY on "goad first step", asks [or map u/ <br />1' contours and a sirn ed surveyors rcpt. <br />UYWCD (GJ 150) -5/18/87 80.5 acres have been acquired. <br />-5/20/87 Itr. FWS to COE--outlines grog. <br />requirements [or area <br />-5/21/87 It r. UYWCD to COE--i'Y /anderstnd <br />that COE will attpt pln w/ 2' fool oars <br />-5/27/87 Lt r. DDW to CDE - DOW approves <br />concepts <br />-5/29/87 ltr: UYWCD to COE--Plan has <br />been modified to comply w/COE request <br />-6/25/87 itY:COE to UYWCD-- app rvs the plan for construction <br />-11/IJ/87 mtnP,: Access/management plan has not yet been <br />submitted, DOw is working on it. <br />-5/11/88 L[r: DOW [o UYWCD--DOW is currently working on plan <br />monitor only as par[ o[ no rmaL activities. <br />-6/1/88 Ltr: COE [o UYWCD RE: permit requirements <br />1. Construction plan must be finalized <br />2. Start vegetation monitoring <br />-10/20/88 memo: CDC to LBean--transmits cy of revised pia <br />(revision dated 10/88) <br />-11/2/88 meeting: G McNUre requested mgt, plan incl. as <br />bunts of area. J Fe[c her indicated plan would be provided <br />by FEB. 1989. <br />-11/8/88 1[r. UYWCD to COE sends mgt, plan w/o as bunts. <br />-ll/l8/8B Itr: UYWCD to COE--T ransec is have been installed <br />-12/5/88 It r. COE to UYWCD--Mgt pln needs more detail on <br />operation and mgt. Parts 1 <br />-12/8/98 As bunts not yet provided. <br />-12/14/88 Tele: LBean to ]Fetcher--mg[. plans have been <br />enhanced as per COE request. Will be sent out shortly <br />UYWCD (GJ 150) -6/1/87 Signed surveyors statement <br />that more than 78 acres exist sent <br />to COE. (documentation not on file with <br />