Laserfiche WebLink
S'fAG EC0ACi1 RESERVOIR PROJECT - ECP <br />r' <br />Commitments 7/ <br />16-DEC-88 14:56:79 Pg 4 <br />Reference Page Protect Stage Responsible <br />Document Number (MOnitaring)1/ <br />Dsgn Const 06H Party <br /> pasture land on [he north shore of the <br /> reservoir and the south slope of elacktail <br /> Mountain and cast of the proposed ret reation <br /> area and downstream of the dam for elk and <br />~ other wildlife. The District will provide <br /> funds in an amount to be determined in <br /> cooperation with DOW for initial range <br /> improvement and management of these <br /> improvements for the life o[ the Protect. 9/ <br />12. UYWCD will prohibit livestock grazing on 449 FF.B <br /> of the 672 acres of the parcel adtacent to <br /> the north and east side of Stagecoach <br /> Reservoir, and would allow grazing on a <br /> forage availability basis for up to 75 AUM's, <br /> per season for cattle on the remaininG 227 <br />1 acres in the northeast corner of [he parcel <br /> between June 15 and October IS annually, <br /> for the life wE the protect. <br />Il. Provide an additional 616 acres of wildlife FES <br /> land throuP,h an exchange of the Bob Adams <br /> Estate and BLM land. <br />, 14. UYWCD will discourage dis[a rbance in the elk FES <br /> winter range by installing signs on County <br /> Road I8 to discourage public trespassing in <br /> the elk winter range during the December 15 <br /> to May 15 critical period, also daring this <br /> critical period the rood would be Closed for <br />_, 7 months as determined by the DUW. <br />18. UYWCD will provide $1,000 For construction FE$ <br /> and Chen maintain an elk proof drift fence an <br />- N. side of County Rcad I8, if it is <br /> determined by UOW that such a fence is needed <br /> alter the reservoir is in place. <br />WIL DLIFE/WETLANDS 8/ <br />J Gen eral <br />]6. UYWCD will develop wetland areas concurrently FES <br /> with Protect construction and complete be Co re <br /> reservoir Cilling, Management agreements <br /> would be executed prior to construt lion. <br />V <br />IB, 27, X <br />157 <br />S-7, 18, X X <br />756.]57 <br />Comments ~, ' <br />and <br />Commilmenl Status ' <br />managmen[ plan. (AS yet not on file <br />w/ D$BR) <br />-5/11/88 Ltr. DOW to UYWCD said DOW is <br />currently helping in preparation of plan <br />WiII monitor only as Fart o[ normal <br />activities. First draft has been prep rd <br />-11/2/88 meet: J Toolen said plan sent <br />to Dl'WG D. Plan calls for $45,000 of <br />fencing. J Fetcher felt that this exp. <br />is too great and may no[ be needed based on [he fact that <br />cattle that were previously grazing in the area will De <br />elimani led altogether. <br />-12/8/68 meet sched. between DOW/UYWCD to resolve problem. <br />X UYWCD, DOW -11/17/87 Meeting: J. Fetcher • <br />(CJI50) stated that there will no longer <br />be grazing on the subject lands <br />beginning spring 1988. <br />UYWCD (CJ180) -II/Ll/87 Exchange is currently 1iM up <br />in estate settlement. Exchange should <br />be completed by end of 1990. <br />14, l8, X % UYWCD (GJ 150) -5/18/87 Routt Co. has agreed by <br />25, 160, resolution. <br />756, 757 <br />18, 357 X X UYWCD (GJ 150) -5/18/87 DOW will recommend fence iC <br />necessary. Criteria should be deve lo! <br />by DOW in 1988. <br />124 X X X UYWCD (GJ 150) -5/18/87 Agreements on TNC properties <br />on schedule. <br />-Final aquisition by 5/89, <br />-11/17/87 meeting: J. Fetcher stated <br />that fencing is complete on Hein <br />Island and Vit [or American properties. <br />-UYWCD will manage the upper end <br />o[ [he reservoir (see letter 6/28/87 <br />