Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PERMITTING <br /> <br />An environmental assessment and a Corp of Engineers 404 permit would be required prior to construction <br />of the dam and reservoir. Due to the type of habitat at the reservoir site and as the dam would be located <br />on a n essentially dry drainage course, the permitting would not be expected to be difficult. <br /> <br />Prior to moving ahead with this project however, we would recommend an assessment of the site be made <br />as to animal and plant species and impacts that must be considered for the permitting process. <br /> <br />Stone Canyon Dam Feasibility <br /> <br />Page 13 <br />