Laserfiche WebLink
<br />~----------------- <br /> <br />TABLE 5 <br />STOhlE CANYON RESERVOIR <br />CONSTRUCTION COST ESTIMATE <br /> <br /> - <br /> . Alternative 2 Alternative 3 <br /> Item Unit Unit Price Quantity Cost Quantity Cost <br />Mobilization, Insurance, Bonds L.S. 5% 1 $92,340 1 $93,260 <br />ClearinQ, Stripping, GrubbinQ Acre $ 1,500.00 15 $22,500 15 $22,500 <br />Dam Earth Borrow and Fill CY $ 3.50 120015 $420,053 124034 $434,119 <br />Cutoff Trench Excavation CY $ 5.00 30885 $154,425 34330 $171,650 <br />Groutinq L.S. $ 100,000.00 1 $100,000 1 $100,000 <br />PVC Liner Acre $ 14,000.00 15 $210,000 15 $210,000 <br />Chimney Drain Placement FT $ 10.00 764 $7,640 705 $7,050 <br />Blanket Drain Placement FT $ 5.00 764 $3,820 705 $3,525 <br />Toe Drain Placement FT $ 17.00 1040 $17,680 1155 $19,635 <br />Drain Material TN $ 10.00 11960 $119,600 8532 $85,320 <br />Riprap (Material and Placement) TN $ 22.00 6590 $144,980 7320 $161,040 <br />Beddinq (Material and Placement) TN $ 17.00 1650 $28,050 1830 $31,110 <br />Roadbase TN $ 14.50 460 $6,670 515 $7,468 <br />Spillway Cutoff Wall FT $ 220.00 300 $66,000 300 $66,000 <br />Spillwav Channel L.S. $ 384,000.00 1 $384,000 . 1 $384,000 <br />Outlet Pipe & Encasement FT $ 300.00 318 $95,400 316 $94,800 <br />Outlet Gate, Thimble, & Operator L.S. $ 15,000.00 1 $15,000 1 $15,000 <br />Outlet Stem FT $ 80.00 145 $11,600 145 $11,600 <br />Outlet Stem Grade Beam CY $ 500.00 17 $8,500 17 $8,500 <br />Staff GaQe FT $ 6.15 145 $892 145 $892 <br />Outlet Gate Structure L.S. $ 12,000.00 1 $12,000 1 $12,000 <br />Outlet Structure L.S. $ 12,000.00 1 $12,000 1 $12,000 <br />Seedinq Acre $ 1,000.00 6 $6,000 7 $7,000 <br />Additional Property Acre $ 5,000.00 $0 3 $15,000 <br />Total Construction Cost $1,846,809 $1,880,208 <br /> - <br />