Laserfiche WebLink
<br />WOOdward-CIYcI <br /> <br />. <br /> <br />6.0 <br />PROPOSED FEES <br /> <br />Our estimated costs for the various work items in our proposed scope of work are given <br />in Table 6-1. These estimated costs are based on the scopes of work of the various work <br />tasks, as described in Section 4.0. The costs are based on our estimate of work hours <br />and subcontract costs, using the attached fee schedule for 1993, The actual required <br />work effort may differ from that described in Section 4,0, depending on conditions <br />encountered during investigation of the slide, On all of our projects, we make every <br />effort to control costs in the best interests of our clients. We will not exceed the <br />estimated costs given in Table 6-1 without prior justification to and approval from <br />Beaver Park Water Inc. <br /> <br />Woodward. Clyde Consultants <br /> <br />23360/PRO.6 12-08-93(8:53am)/RPT <br /> <br />6-1 <br />