Laserfiche WebLink
<br />WoOdWard-CIY_ <br /> <br />. <br /> <br />5.0 <br />PROPOSED WORK SCHEDULE <br /> <br />5.1 GENERAL <br /> <br />We are prepared to start work within about 1 week after Notice to Proceed, We would <br />plan to start drilling in the field about 10 to 15 days after Notice to Proceed, contingent <br />on weather conditions and the availability of a drill rig. <br /> <br />Woodward-Clyde Consultants <br /> <br />2336OJPRO.5 12-08-93(8:53am)!RPT <br /> <br />5-1 <br />