Laserfiche WebLink
<br />WOOdwardoClYcI <br /> <br />. <br /> <br />TABLE 6-1 <br /> <br />ESTIMATED COSTS <br /> <br />Total <br /> <br />$18,000-22,000 <br />3,000-3,500 <br />6,000-8,000 <br />4,500-5,000 <br />9.000-11.000 <br />$40,500-49,500 <br /> <br />Task 1 - Test Hole Piewmeters <br />Task 2 - Surveying <br />Task 3 - Laboratory Testing <br />Task 4 - Stability Analyses <br />Task 5 - Report <br /> <br />OPTIONAL ITEMS <br /> <br />Task 1 - Combined PiezometerlInclinometer Casing <br />Task la - Inclinometer Readings <br />Task 2 - Dry Core Sampling <br />Task 3 - Test Pits <br />Task 4 - Spillway Conceptual Design <br />Task 5 - Embankment Raise <br />Task 6 - Outlet Works Inspection <br /> <br />$3,100 <br />2,100 ea, <br />4,000 <br />1,500 <br />5,500 <br />2,600 <br />5,000 <br /> <br />Woodward-Clyde Consultants <br /> <br />23360/PRO-T.6-1 12"()8-93(8:54am)/RPT <br /> <br />Sheet 1 of 1 <br />