My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153976 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153976 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2014 11:01:26 AM
Creation date
10/5/2006 11:46:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153976
Contractor Name
Boyle Engineering Corporation
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />. <br /> <br />. <br /> <br />Page 3 <br /> <br />Boyle will develop and submit electronic draft versions of these two sections. The State <br />will provide comments within two weeks, which Boyle will incorporate into final <br />electronic versions. <br /> <br />Deliverables: <br />. Draft section describing the Yampa River basin, setting the physical, historical <br />and institutional context for the model <br />. Draft section describing modeling issues and approach <br />. Final section describing the Yampa River basin <br />. Final section describing modeling issues and approach <br /> <br />Task 3 - Develop input documentation <br /> <br />This section will more or less replace the current Section 4.0 Historical Data. It is <br />expected to describe input files for all data sets used in calibration, for both the monthly <br />and daily models. It will describe only the current model, the general approach to <br />developing the data, and significant exceptions or special cases. <br /> <br />Boyle will develop and submit draft electronic versions of this section. Within two weeks, <br />the State will provide comments which Boyle will incorporate into a final electronic <br />version of the section. <br /> <br />Deliverables: <br />. Draft section model input section, describing all files used in calibration <br />. Final model input section <br /> <br />Task 4 - Develop calibration section <br /> <br />This section will describe calibration of the Yampa River model. It will describe issues <br />that have been worked on at different points in the model's history, if they relate to <br />current data and understanding of the system. For example, calibration that uncovered <br />an incorrectly placed gage that was later corrected would not be addressed. However, <br />efforts to distribute un9aged baseflow in an area where the model still shows shortages <br />would be described. <br /> <br />The section will also include results from the calibrated model, focusing on key gages <br />and diversion sites as the documentation has in the past. <br /> <br />Boyle will develop and submit draft electronic versions of this section. Within two weeks, <br />the State will provide comments which Boyle will incorporate into a final electronic <br />version of the section. <br /> <br />Deliverables: <br />. Draft section model input section, describing all files used in calibration <br />. Final model input section <br /> <br />Exhibits_new <br /> <br />315/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.