Laserfiche WebLink
<br />I <br /> <br />I <br />I <br />I <br /> <br />Estimates of land acquisition requirements for reservoirs <br />were based upon the maximum reservoir surface area for each reservoir <br />size. This value in acres was then multiplied by 1.5 to obtain a more <br />reasonable approximation of actual land acquisition requirements. <br /> <br />I <br /> <br />I <br /> <br />tity <br />unit <br /> <br />Cos ts were es timated by combining unit prices wi th the quan- <br />estimates. The unit prices used were the same in all cases. The <br />prices are summarized on Table IV-I. <br /> <br />B. Kendig Dam and Reservoir Sites <br /> <br />I <br /> <br />1. General History <br /> <br />I <br /> <br />The Kendig damsite has been included in most previous project <br />configurations. Because of this, the dam has been extensively studied <br />by the USBR. The 1982 planning studies (Ref. 42) included Kendig Dam <br />and Reservoir. The USBR designs were used as a basis for further work <br />in this report. <br /> <br />I <br /> <br />The 1982 planning study included Kendig Dam which was 202 ft. <br />high. The dam was an earthfill embankment which produced a reservoir <br />with a total capacity of 18,060 acre-feet. A 72" diameter outlet <br />works feed the West Divide Canal located immediately downstream. The <br />dam was located downstream of the existing Highline Canal and upstream <br />of the existing Porter Ditch. <br /> <br />I <br />I <br /> <br />The USBR estimated the cost of the Kendig !lam and Reservoir <br />to be $37,800,000 in January 1980 dollars. This estimate is sum- <br />marized below: <br /> <br />I <br />I <br /> <br />Item <br /> <br />Cost1 <br /> <br />I <br />I <br /> <br />Dam Structure <br />Spillway <br />Auxilary Spillway <br />Outlet Works <br /> <br />$19,350,000 <br />2,900,000 <br />405,000 <br />5,010,000 <br /> <br />Subtotal <br /> <br />$27,665,000 <br /> <br />I <br /> <br />Land and Rights <br />Relocation and Property of Others <br />Clearing Land <br />Structures and Improvements <br /> <br />805,000 <br />580,000 <br />25,000 <br />60,000 <br /> <br />Subtotal <br /> <br />$ 1,470,000 <br /> <br />I <br />I <br /> <br />IV-5 <br /> <br />I <br />