Laserfiche WebLink
<br />. <br /> <br />RCC dam spillways are integral wi th the dam; stan- <br />dard reinfo rced <:oncrete as used to cover the RCC <br />portions ,of the dam. <br /> <br />I I <br />II <br />I <br />I <br /> <br />. 30 day evacuation of full reservoir <br />. Unregulated av,erage June flow at the dam <br />. Peak downstream demand <br /> <br />I <br />I <br /> <br />b. Outlet Works <br /> <br />- Minimum discharge capacity is the greater of: <br /> <br />- Conduits to be 2', 3' 4' or 5' diameter prestressed <br />concrete cylinder pipe. <br /> <br />I <br />I <br /> <br />- Intake structures to contain hydraulically operated <br />sluice gate for flow control <br /> <br />Outlet structures to be standard USBR impact <br />stilling basins <br /> <br />I <br /> <br />These criteria are the primary elements which control the <br />cost of each of the project features. The details of the layouts are <br />presented in the following sections ,and in Appendix D. <br /> <br />I <br /> <br />s. Methodology for Quantities and Cost Estimates <br /> <br />I <br /> <br />To ensure correct relative costs a standard procedure for <br />estimating quantities and making cost estimates was established. Dam <br />quantities were then estimated using uniform assumptions and identical <br />lists of items. Quantities for thE! spillways and outlet works were <br />estimated in a similar manner. The resulting tabulations are pre- <br />sented in detail for each dam layout in Appendix D. <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />The purpose of a reconnaissance level study such as this is <br />to identify those project features which are the most efficient and <br />offer the highest and best use of our natural resources. Cost estima- <br />tes used for this purpose must provide an accurate guide to the rela- <br />tive cost of the project features. The absolute costs are desirable <br />but much less important. The selection of the correct optimum project <br />configuration depends on having ,:ost estimates for the project <br />features which are relatively correct. <br /> <br />IV-4 <br /> <br />I <br />I <br />I <br />