My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00258
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:14 AM
Creation date
10/5/2006 11:45:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0034X
Contractor Name
Basalt Project USBR 1974
Contract Type
Miscellaneous
Water District
0
County
Garfield
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />CHAPl'ER VII <br /> <br />MISSOURI HEIGHTS ENLARGEMEm' PLAN <br /> <br />Outdoor Residential Use <br /> <br />Benefits from outdoor residential use are estimated at an average <br />of $355,000 annually, based on the cost of the cheapest single-purpose <br />alternative means of development. The alternative was based on purchase <br />of water from Ruedi Reservoir and included a system to pump water from <br />the Roaring Fork River near El Jebel, approximately 4 miles below Basalt, <br />to the head of the Landis Canal. It also included a canal that would <br />follow the same alignment as the Landis Canal in the plan previously dis- <br />cussed in this chapter. An estimate was made of the cost of pumping the <br />full supply of 3,000 acre-feet of water annually anticipated for outdoor <br />residential use 20 years following project construction. This amount was <br />then adjusted to reflect smaller amounts of water that would be used in <br />early years of project operation. 'Derivation of the benefits is shown <br />below. <br /> <br />. <br /> <br />Investment <br />Construction cost (January 1973 prices) <br />Interest during construction (7 percent) <br />Total <br />Annual costs for 3,000 acre-feet of water <br />Investment (25-year period at 7 percent) <br />Operation, maintenance, and replacement costs <br />Costs of power for pumping <br />Ruedi Reservoir storage charge <br />Total <br />Adjusted benefits for varying water supply <br /> <br />Recreation Benefits <br /> <br />$3,290,000 <br />~45,000 <br />3, 35,000 <br /> <br />311,900 <br />69,400 <br />75,700 <br />JO ,000 <br />7,000 <br />355,000 <br /> <br />Benefits for recreational use at Missouri Heights Reservoir are esti- <br />mated at $15,000 annually. These are based on annual visitations of 20,000 <br />people, estimated Qy the Bureau of Outdoor Recreation, and a benefit of <br />$0.75 per visit, estimated by the Bureau of Reclamation. <br /> <br />Summary of Benefits <br /> <br />Total benefits for the Missouri Heights enlargement plan average <br />$420,700 annually over a lOO-year period as shown on the following page. <br />The estimates have been adjusted to reflect loss of lands to agricultural <br />use as a result of construction of project facilities. <br /> <br />. <br /> <br />59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.