My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00258
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:14 AM
Creation date
10/5/2006 11:45:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0034X
Contractor Name
Basalt Project USBR 1974
Contract Type
Miscellaneous
Water District
0
County
Garfield
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />rr' <br /> <br />CRAPrER IV <br /> <br />GRAVITY PIPELINE PLAN <br /> <br />Rights-of-way <br /> <br />Construction of project features would require the acquisition of pri- <br />vate and State lands and the withdrawal of some Federal lands as shown below. <br /> <br />Landis Pipeline <br />Municipal and domestic <br />trunklines <br />Landis Canal <br />Irrigation laterals <br />Drains <br />Total <br /> <br />Rights-of-way required for <br />(Unit--acres) <br />Privately <br />owned land <br />Nonirri- Irri- <br />gated gated <br />57 18 <br /> <br />project <br /> <br />Federal <br />land <br />96 <br /> <br />State <br />land <br />43 <br /> <br />Total <br />214 <br /> <br />381 <br /> <br />58 <br />239 <br /> <br />104 <br /> <br />54 <br /> <br />236 <br />166 <br />104 <br />58 <br />778 <br /> <br />57 <br />166 <br />101 <br /> <br />163 <br /> <br />n <br /> <br />5 <br />3 <br /> <br />Estimated Costs <br /> <br />Construction costs <br /> <br />c <br /> <br />The construction cost of the gravity pipeline development is esti- <br />mated at $31,310,000 as shown below. The costs were estimated by the <br />Bureau of Reclmnation on the basis of January 1973 prices and feasibil- <br />ity design data. The estimates do not include costs of treatment and <br />distribution facilities for the municipal and domestic water supplies <br />that would be provided by the water users. <br /> <br />Project feature <br />Landis Pipeline <br />Municipal and domestic trunklines <br />Landis Canal <br />Irrigation laterals <br />Corrnnunica.tions and control equipment <br />Drains <br />Permanent operating facilities <br />Total <br /> <br />Estimated <br />cost <br />$20,800,000 <br />4,8Qo,000 <br />3,400,000 <br />1,070,000 <br />790,000 <br />370,000 <br />80,000 <br />31,310,000 <br /> <br />Operation, maintenance, and replacement costs <br /> <br />L <br /> <br />Operation, maintenance, and replacement costs of project facilities <br />have been estimated at $88,000 annually on the basis of 1970-72 prices. <br />An emergency reserve fund of $50,000 would be established by the Basalt <br />Water Conservancy District during the project development period to de- <br />fray unusual operating expenses. <br /> <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.