Laserfiche WebLink
<br />1 <br />I <br />I <br />I <br />I <br />I <br />1 <br />1 <br />I <br />1 <br />I <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br /> <br />In Phase 2: <br /> <br /> <br />o Refinement of the water allocations and yields, <br /> <br /> <br />preparation of feasibility-level designs and cost <br /> <br /> <br />estimates, and preparation of detailed financial <br /> <br /> <br />analyses for the selected project configuration, <br /> <br /> <br />including development of Radium Reservoir as a <br /> <br /> <br />wildlife habitat. <br /> <br />Phase 2 of the study will not be a full feasibility evaluation <br /> <br /> <br />since the geotechnical investigations required for a true <br /> <br /> <br />feasibility-level study will not be conducted under this Plan <br /> <br /> <br />of study. <br /> <br />General direction for the conduct of the study will be <br />provided by the CWCB. An Advisory Committee comprised of <br />representatives of the SMWCD and other knowledgeable <br />individuals mutually agreed upon by the CWCB and the SMWCD <br />will meet on a regular basis to review study results and to <br />advise the CWCB on the conduct of the study. The Contractor <br />will meet periodically with the Advisory Committee in the <br />study area. <br /> <br />coordination with the Colorado Water Conservation Board (CWCB) <br /> <br />Formal coordination with the CWCB will consist of bi-weekly <br /> <br /> <br />oral progress reports, monthly written progress reports, and <br /> <br /> <br />A-4 <br />