Laserfiche WebLink
<br />1 <br />1 <br />1 <br />I <br />I <br />I <br />1 <br />1 <br />1 <br />I <br />I <br />1 <br />I <br />I <br />1 <br />I <br />I <br />I <br /> <br />o <br /> <br /> <br />Formulation of a number of (12 to 15) preliminary <br /> <br /> <br />project systems. Reduction of the 12 to 15 <br /> <br /> <br />preliminary systems by a screening process to four <br /> <br /> <br />semi-final project systems, including: <br /> <br />o <br /> <br />a. a maximum system consisting of Western I S <br />recommended High Elevation System; <br /> <br />b. three smaller systems consisting of a minimum <br />and two intermediate project configurations. <br /> <br />Evaluation of the four semi-final <br /> <br /> <br />configurations at a reconnaissance <br /> <br /> <br />Summarizing of the range of results in an <br /> <br /> <br />report; presentation of the options at a <br /> <br /> <br />meeting; and discussions during a two-month <br /> <br /> <br />period leading to a "go/no-go" decision. <br /> <br />project <br />level. <br />interim <br />public <br />review <br /> <br />Selection of the final project configuration to be <br /> <br /> <br />evaluated in Phase 2 if a "go" decision is reached, <br /> <br /> <br />or preparation of a Concluding Report if a "no-go" <br /> <br /> <br />decision is made. <br /> <br />o <br /> <br />A-3 <br />