Laserfiche WebLink
<br />1 <br />I <br />I <br />I <br />1 <br />I <br />1 <br />I <br />1 <br />I <br />I <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br /> <br />interim memorandums upon completion of each major task, all as <br /> <br />stated in the individual task descriptions. <br /> <br />Additionally, <br /> <br />Contractor will confer with the CWCB Project Coordinator on a <br /> <br />day-to-day basis as the need arises or when requested. The <br /> <br />principal channel of coordination will be between Contractor's <br /> <br />Project Manager and/or Assistant Project Manager and the CWCB <br /> <br />proj ect Coordinator. <br /> <br />As appropriate, and for technical or <br /> <br />specific issues, direct communication between Contractor's <br /> <br />lead professionals involved in the study and the CWCB and the <br /> <br />San Miguel Water Conservancy District (SMWCD) <br /> <br />encouraged. <br /> <br />STUDY WORK TASKS <br /> <br />staff is <br /> <br />The feasibility study of the San Miguel Project will be <br /> <br />performed under the following eleven principal study tasks: <br /> <br />Task No. <br /> <br />Phases <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br /> <br />1 <br />1 <br />1 <br />1 <br />1 & 2 <br />1 <br />I & 2 <br /> <br />8 <br />9 <br />10 <br />11 <br /> <br />2 <br />1 & 2 <br />1 & 2 <br />1 & 2 <br /> <br />Title <br /> <br />Data Acquisition and Review <br />Hydrology <br />Water Rights <br />Institutional Considerations <br />Water Demands <br />Project Elements <br />Development and Evaluation of <br />Alternatives <br />Designs and Cost Estimates <br />Financial Feasibility <br />Presentations and Meetings <br />Reports <br /> <br />A-S <br />