Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />three scenarios of M & I development and cropping <br />patterns. Obtain concurrence of the CWCB and SMWCD. <br /> <br />8. Using criteria established in Task 4, estimate water <br />demands required for development and maintaining the <br />wildlife habitat at the Radium Reservoir site. <br /> <br />9. Prepare memorandum summarizing the Phase 1 task efforts <br />and results and submit to the CWCB. <br /> <br />In Phase 2: <br /> <br /> <br />10. Perform field reconnaissance investigations of the <br /> <br /> <br />proposed service areas for the selected project <br /> <br /> <br />configuration and refine soil classifications. <br /> <br />11. Based on the results of step 10, refine the cropping <br />patterns of the final project configuration. <br /> <br />~2. Refine the irrigation water demands for the final <br />project configuration. <br /> <br />13. Prepare memorandum summarizing the Phase 2 task efforts <br />and results and submit to the CWCB. <br /> <br />A-35 <br />